+254 714 719 028 info@milimanidrilling.com
Borehole Cost Calculator Kenya 2026 banner

Borehole Cost Calculator Kenya 2026

Free borehole cost calculator — get an instant estimate for your county. Drilling, pump, solar & storage costs explained. KSh 800K–2.5M typical range.

Borehole Costing · 2026 Guide

How much does a borehole cost in Kenya?

Use our free cost calculator to get an instant estimate tailored to your county, ground conditions, and project type — then request a full itemised quote from our engineers.

KSh 800K – 2.5M Typical completed borehole
KSh 6,000 – 10,000 Per metre drilled (published rate)
120 – 250 m Typical borehole depth in Kenya
Free Estimate Tool

Get an instant cost range for your project in under 2 minutes.

Start Calculator
Step 1 of 3

Tell us about your project

These 5 details let us calculate a meaningful estimate. No commitment required — your results are instant.

Domestic: ~150–500 L/day per household Farm: ~5,000–50,000 L/day Commercial: ~1,000–20,000+ L/day
150 m

Typical range for Kenya: 80–250 m. County hint updates when you choose a county above.

Step 2 of 3

Your estimate is ready — unlock it now

Enter your contact details so we can send you the full breakdown and have our team follow up with a detailed quote.

Project —
Drilling estimate Unlocks after step 2
Full cost range Unlocks after step 2

Your request has been sent. Our team will follow up shortly with a detailed quotation.

Step 3 of 3 · Preliminary estimate

Your borehole cost estimate

Full cost component breakdown

Cost component Indicative range Basis / notes

This is a planning estimate, not a quotation. Published drilling rates are KSh 6,000–10,000/m; survey, test pumping, casing design, storage and civil works require site assessment. Final pricing depends on borehole yield, approved depth, pump specifications and groundwater quality.

2026 Reference Guide

Borehole cost breakdown by component

Every complete borehole project involves these six cost centres. Understanding each helps you plan your budget and evaluate quotations.

Component 1

Hydrogeological Survey

A hydrogeological survey identifies the best borehole siting location, predicts aquifer depth and yield potential, and produces the regulatory siting report required before drilling commences.

Survey typeIndicative cost
Desk study only (existing data)KSh 20,000 – 40,000
VES (Vertical Electrical Sounding)KSh 35,000 – 80,000
Full geophysical survey (ERT / TEM)KSh 80,000 – 200,000
Siting report for WARMA submissionIncluded in survey package
Skipping a survey increases the risk of a dry or low-yield borehole and wasted drilling costs.
Component 2

Borehole Drilling

Drilling cost is charged per metre drilled (not per metre cased). The rate depends on the formation — soft alluvial ground costs less per metre than hard basement rock which requires more time, fuel and bit wear.

FormationRate per metreExample: 150 m
Soft / alluvial / clayKSh 6,000 – 8,500KSh 900K – 1.28M
Hard rock / basement / volcanicKSh 8,000 – 10,000KSh 1.2M – 1.5M
Mixed / unknown (blended)KSh 6,000 – 10,000KSh 900K – 1.5M
Mobilisation factorTypical addition
Within 100 km of NairobiKSh 40,000 – 80,000
100–250 km (county town)KSh 80,000 – 150,000
Remote / ASAL countiesKSh 150,000 – 300,000+
Casing (uPVC or steel) is usually priced separately at KSh 2,500–6,500 per installed metre.
Component 3

Test Pumping

After drilling, a test pump is used to measure the aquifer's safe yield (litres per hour), static and dynamic water levels, and water quality parameters. The results determine the permanent pump sizing and inform the NEMA licence application.

Test typeDurationIndicative cost
Basic air-lift yield test2–4 hoursKSh 20,000 – 40,000
Step-drawdown test4–8 hoursKSh 40,000 – 80,000
Constant-rate pump test (standard)24 hoursKSh 80,000 – 150,000
Extended pump test (commercial)72+ hoursKSh 150,000 – 300,000
Water quality analysis (lab)5–10 daysKSh 15,000 – 60,000
WARMA requires a 24-hour constant-rate test report before issuing a water abstraction licence.
Component 4

Pump Supply & Installation

The permanent submersible pump is sized from the test pump results. Key factors are the borehole yield (m³/hr), total dynamic head (depth + friction losses), and daily demand. Oversizing wastes money; undersizing causes pump failure.

Pump type & capacityIndicative supply costInstallation
Light-duty electric (domestic, ≤1 m³/hr)KSh 45,000 – 90,000KSh 20,000–40,000
Mid-range electric (farm, 1–3 m³/hr)KSh 90,000 – 180,000KSh 30,000–60,000
High-capacity electric (commercial, 3–10 m³/hr)KSh 180,000 – 350,000KSh 60,000–100,000
Rising main pipe (per metre)KSh 600 – 1,200/m—
Branded pumps (Grundfos, Pedrollo, Lorentz) carry higher upfront cost but significantly longer service life and warranty support.
Component 5

Solar Pumping System

Solar pumping eliminates electricity bills and is ideal for areas without reliable grid access. The system includes PV panels, an MPPT/VFD controller, mounting structure, wiring and a solar-rated submersible pump.

System sizeTypical useIndicative cost
Small (0.37–0.75 kW, 6–8 panels)Domestic / small farmKSh 180,000 – 320,000
Medium (1.1–2.2 kW, 10–16 panels)Farm / institutionKSh 320,000 – 550,000
Large (3–5 kW, 20–30+ panels)Commercial / irrigationKSh 550,000 – 1,100,000
FactorSolarElectric / grid
Upfront costHigherLower
Running costNear-zeroKSh 5,000–40,000/month
Payback period3–6 yearsN/A (ongoing)
Off-grid suitabilityExcellentPoor
Component 6

Water Storage & Distribution

Storage tanks buffer against pump downtime, solar irradiation gaps and peak demand. Elevated tanks provide gravity distribution; ground-level tanks require a pressure pump. Civil works include slab, fencing and pipework.

Tank type & capacitySupply costCivil works
Plastic (polyethylene) 1,000–5,000 LKSh 8,000 – 35,000KSh 5,000–15,000
Plastic 5,000–10,000 LKSh 35,000 – 65,000KSh 15,000–30,000
GRP / fibreglass 10,000–50,000 LKSh 65,000 – 250,000KSh 30,000–80,000
Galvanised steel / concrete (custom)Site-specificSite-specific
Elevated tower structure (5–10 m)KSh 80,000 – 200,000KSh 50,000–120,000
Rule of thumb: store at least 1 day's peak demand. For solar systems, store 2 days' demand to cover cloudy periods.

Typical total project cost ranges by use type (2026)

Project type Depth range Low estimate Mid estimate High estimate Key variables
Domestic (household) 80–150 m KSh 600,000 KSh 1,000,000 KSh 1,600,000 Depth, ground type, pump size
Farm / irrigation 100–200 m KSh 1,000,000 KSh 1,800,000 KSh 3,000,000 Yield demand, solar vs. electric, storage
Commercial / institution 120–250 m KSh 1,500,000 KSh 2,500,000 KSh 5,000,000+ Yield, treatment, elevated storage, licencing
ASAL / remote county 80–200 m KSh 1,200,000 KSh 2,200,000 KSh 4,000,000+ Mobilisation, solar requirement, logistics

These ranges are indicative planning figures based on 2026 published rates. All figures are exclusive of VAT, NEMA/WARMA licensing fees, and land/access costs. Request a site-specific quotation for a binding price.

County Reference

Typical borehole depths by Kenya county

These depth ranges are indicative based on regional hydrogeology. A site-specific geophysical survey will refine the target depth for your plot.

Baringo
120–180 m
Mixed volcanic & sedimentary
Bomet
100–160 m
Volcanic highlands
Bungoma
80–150 m
Soft alluvial & weathered granite
Busia
60–120 m
Soft alluvial sediments
Elgeyo-Marakwet
150–220 m
Hard Rift escarpment rock
Embu
80–140 m
Volcanic basalt & ash
Garissa
80–160 m
Sandy alluvial & limestone
Homa Bay
60–120 m
Lacustrine sediments
Isiolo
120–200 m
Hard crystalline basement
Kajiado
100–200 m
Hard volcanic & basement
Kakamega
80–140 m
Weathered granite & gneiss
Kericho
100–160 m
Volcanic highlands
Kiambu
80–160 m
Volcanic phonolite
Kilifi
60–140 m
Coastal limestone & coral
Kirinyaga
80–150 m
Volcanic & alluvial
Kisii
80–140 m
Volcanic highlands
Kisumu
60–120 m
Lacustrine sediments & clay
Kitui
120–200 m
Hard crystalline basement
Kwale
60–130 m
Coastal sandy & coral limestone
Laikipia
120–200 m
Hard basement rock
Lamu
60–120 m
Coastal coral & limestone
Machakos
100–180 m
Hard crystalline basement
Makueni
120–200 m
Hard crystalline basement
Mandera
80–180 m
Sandy alluvial & limestone
Marsabit
120–220 m
Volcanic & hard basement
Meru
80–160 m
Volcanic basalt & phonolite
Migori
80–140 m
Volcanic & lacustrine
Mombasa
60–120 m
Coral limestone & coastal sand
Murang'a
80–160 m
Volcanic phonolite & ash
Nairobi
80–180 m
Volcanic phonolite & trachyte
Nakuru
100–180 m
Rift valley volcanics
Nandi
100–160 m
Volcanic highlands
Narok
100–200 m
Mixed volcanic & sedimentary
Nyamira
80–140 m
Volcanic highlands
Nyandarua
100–180 m
Volcanic & moorland
Nyeri
80–160 m
Volcanic basalt & ash
Samburu
120–220 m
Hard basement crystalline
Siaya
60–120 m
Lacustrine clay & sediment
Taita-Taveta
100–180 m
Mixed basement & volcanic
Tana River
80–160 m
Alluvial sediments & limestone
Tharaka-Nithi
100–180 m
Hard crystalline basement
Trans Nzoia
80–140 m
Volcanic & alluvial
Turkana
80–200 m
Sedimentary & basement
Uasin Gishu
80–150 m
Volcanic highlands
Vihiga
80–130 m
Weathered granite & gneiss
Wajir
80–160 m
Sandy alluvial & limestone
West Pokot
120–200 m
Hard basement crystalline

Ready for a formal quotation?

Our engineers will assess your site, confirm the depth and yield, and provide a binding itemised price — at no obligation.